Construction scheduling guides
Practical how-tos: how a construction schedule takes shape, how to plan a phase and how to move from the spreadsheet to a real schedule.
- Disrupted works: assessing the options A six-step sequence – and the three axes on which every option has to be judged.
- Documenting delay correctly A five-step sequence – and the catalogue of mistakes that make claims fail in practice.
- From Excel to a schedule When a spreadsheet reaches its limits – and how to move over without losing data.
- How to plan a construction phase A five-step guide – from the task list to the checked schedule.
- Reporting schedule status to the client Why schedule status is more than a printout of the programme – and what belongs in the meeting.